vsszan1545062009421.jpg

Provencher_Roy were engaged by Canadian credit union, Desjardins, to design their offices located in Montreal, Canada.

During the summer of 2018, Desjardins Movement’s online services’ office spaces moved to the Montréal Tower, once know as the Olympic Tower of Montreal. Unoccupied since 1987, the tower has transformed into an office space, following the design work carried out by Provencher_Roy. Desjardins is becoming the first site’s tenant for the next 15 years.

A massive bringing up to standards
The Montreal Tower had a major make over to better reflect its new corporate vocation. Designed by the architect Roger Taillibert, the original tower employed prefab concrete panels pierced with vertical strips of windows to provide the zenithal lighting suitable for its initial use. The architecture was originally designed to accommodate sports federations, therefore it had to be readapted to accommodate many of Desjardins Group teams.

The thousand employees of the financial institution now enjoy those modern workspaces, bathed in natural light. To achieve this result, almost all the Montréal Tower’s mechanical systems had to be renovated to bring them up to code and standards. However, the biggest challenge was undoubtedly the stripping of the tower’s prefabricated concrete panels to make way for the transparency afforded by a glass curtain wall covering 60% of the facade—an essential element in creating a pleasant work environment. In addition to exposing the spectacular structure of the architectural icon, the approach also brings the tower to life and gives it a new energy.

Symbolic interior design
In addition to ensuring a work environment that encourages exchanges and creativity, the main purpose of the adopted concept was to symbolize the history of the tower. The remarkable space offered by the seven floors of this Québec architectural symbol is now enhanced by a design adapted to the organic forms of the stadium, being able to offer all employees a stimulating and cooperative work environment. Several historical references to the first vocation of the stadium are found within the different areas. Among them, the ceiling’s poppy-shaped details in the waiting area reminds us of the old orange roof canvas, as seen before when inside.

From inside out, the impressive concrete structure was highlighted by the neutral hues of the surfaces. The spacious and bright rooms now have a pale gray floor. The windows are unobstructed to allow the creation of an architectural promenade offering employees a magnificent view of the stadium and the city. Spaces of collaboration and relaxation were also arranged along the imposing glass walls.

The place is articulated as a working tool, with the ultramodern offices incorporating the latest technological equipment in order to attract and meet the needs of employees aged 25 to 35. The lounges, entertainment areas, coffee counters and multifunctional rooms were designed specifically for a young and active clientele. The streamlined and the contemporary styles of its’ interior design creates for Desjardins employees a strong sense of belonging, transforming the development of a “workplace” into a real “living space”.

Desjardins Group’s new premises’ inauguration took place during summer 2018. This unifying revitalized project revived everyone’s pride and sparked a wave of enthusiasm and curiosity among the population. More than a symbolic place that was once dedicated to the Olympic Games, the Montréal Tower is now an indelible mark on the collective imagination.

    • 25 张图片 | Pictures
    vsszan1545062009422.jpg
    vsszan1545062009423.jpg
    vsszan1545062009424.jpg
    vsszan1545062009425.jpg
    vsszan1545062009426.jpg
    vsszan1545062009427.jpg
    vsszan1545062009428.jpg
    vsszan1545062009429.jpg
    vsszan15450620094210.jpg
    vsszan15450620094211.jpg
    vsszan15450620094212.jpg
    vsszan15450620094213.jpg
    vsszan15450620094214.jpg
    vsszan15450620094215.jpg
    vsszan15450620094216.jpg
    vsszan15450620094217.jpg
    vsszan15450620094218.jpg
    vsszan15450620094219.jpg
    vsszan15450620094220.jpg
    vsszan15450620094221.jpg
    vsszan15450620094222.jpg
    vsszan15450620094223.jpg
    vsszan15450620094224.jpg
    vsszan15450620094225.jpg
    • 设计:Provencher_Roy
    • 客户:Desjardins,
    • 面积:150,000 sqft
    • 年份:2018
    • 坐落:Montreal, Canada,
    • 行业:Financial / Investments,
      Ai 分析中……

      暂无用户创作记录!~

      记录用户以此项目图片为灵感使用Ai进行二次创作。

      暂时没有评论,你回一个呗!~

      您需要登录后才可以回帖 登录 | 注册序赞号

      快速回复 返回顶部 返回列表