• 客户:IAT Insurance Group,  
  • 面积:24,000 sqft
  • 年份:2022
  • 坐落:Cheshire, Connecticut, United States,
  • 行业: Insurance,
  • IAT Insurance Group, one of the top two insurers covering companies in the moving and storage business, engaged Avison Young Studio Project Services for a complete 24,000 sq ft multi-tenanted office building renovation of their Cheshire, CT flagship headquarters in an effort to actively expand their 30-person Connecticut workforce.
  • The overall interior design vision brings the outside into the space through an earthy aesthetic comprised of light woods and fabrics, an update to existing finishes, maximum use of glass walls, and expanded opportunities for natural light. An open floor plan representative of upscale, high-end design solutions allowed us to implement a clean and modern execution. Keeping material cost and budget in mind, the design was engineered to include quality materials through Avison Young Studio Project Service’s progressive budgeting capabilities.
  • This project engagement presented unique opportunities to optimize the square footage, particularly with the design solutions centered around two open communication stairs connecting the two floors. With a second-floor focus on workspaces, the first floor, primarily amenity driven, provided collaborative design solutions featuring a training room with movable partitions and break room for community building. Training sessions at this flagship location can welcome team members from various corporate offices around the country and the break room, with flexibility for event activities, has been thoughtfully fit-out for hosting. The break room space has been planned around three separate zones including first, built-in banquet seating, second, cabinetry solutions and the main island, and third, moveable seating with flexible furniture storage solutions.
  • In addition, our project team satisfied exterior scope requirements including replacement and expansion of the patio concrete to enhance the footprint and occupancy opportunities. The delivery team was able to overcome supply chain delays by utilizing our unique methodology, particularly, in support of sourcing specialized equipment at risk of manufacturer delays. As requested, recommendations were made and satisfied to update the drainage system in an effort to mitigate risk of flooding.
11 Images | expand for additional detail vsszan80929250229461.jpg vsszan80929250229462.jpg vsszan80929250229463.jpg vsszan80929250229464.jpg vsszan80929250229465.jpg vsszan80929250229466.jpg vsszan80929250229467.jpg vsszan80929250229468.jpg vsszan80929250229469.jpg vsszan809292502294610.jpg
    • 转载自:Office Snapshots
    • 语言:English
    • 编辑:序赞网
    • 阅读原文
    Ai 分析中……

    暂无用户创作记录!~

    记录用户以此项目图片为灵感使用Ai进行二次创作。

    物自体2023-2-25 10:42:03
    您需要登录后才可以回帖 登录 | 注册序赞号

    快速回复 返回顶部 返回列表