...Hanjian Group
ILLUMINATION: Yushe Yuzhu
PUBLICATION: Nikkei Architecture 2023/01/26 No.1232
PHOTOGRAPHY: © Eiichi Kano, ©Fangfang Tian
预览图片
... Yama-Tani
Designing Period: 2018 – 2020
Construction Period: 2020 – 2023
Location: Paris, France Europe
Principal uses: Housing
Total floor area: 500 m2
Stories: 3 floors + duplex (last floor) + rooftop
Budget: NC
Lead design Architect: KKAA – Kengo Kuma & Associates
Kengo Kuma, Chiz...
预览图片
...Museum/Cultural Completed11,009M²5F /5BF
Construction Period: 2021.8 — 2023.8
Design Period: 2019.5 — 2022.12
Project Period: 2019.5 —
Status: Complete
Floors: 5F/BF5
Site Area: 2,332.90㎡
Building Area: 1,089.13㎡
Total Floor Area: 11,009.43㎡
Construction: KCC corporation
Cont...
预览图片
...设计:Kengo Kuma & Associates,项目面积: 491m²,项目年份:2023,项目摄影:Masaki Hamada (kkpo) ,Construction Team:Matsushita Industry,Facility Engineering Design:Kankyo Engineering INC, Kankyo Engineering,Lighting Designers: Daiko Electric, Daiko Electric Company Limited...
预览图片
...n)的第一家酒店,该市最繁华的地区之一 商业区,截至 2023 年 12 月,东京银座艾迪逊酒店。 这家新酒店遵循与其跨城市兄弟酒店相同的剧本:自信、欢乐、喜怒无常、有点迷人,但它放弃了派对氛围,换成了更安静的氛围,...
预览图片
...计:Kengo Kuma & Associates,项目面积: 2996m²,项目年份:2023,项目摄影:Masaki Hamada (kkpo) ,Interior Designers: Dugout Architects,项目建造:Cool Design, LTD,Facility Engineers:Kankyo Engineering INC, Factor M, Kankyo Engineering,Lighting Designers:Spangle,设...
预览图片
在一片奇迹般留存于都市中的森林里,我们为领先的环保技术公司KANEKA设计了一座与大地相连的木制健康中心。
▽项目概览©︎ Norihito Yamauchi Photography
▽鸟瞰©︎ Norihito Yamauchi Photography
建筑采用了木框架和绿色屋顶,与...
预览图片
隈研吾事务所为冈山大学设计了一栋“木制教室”,该项目将成为新型木结构建筑的实体化“教材”。
▽项目外观© SATOH PHOTO
▽木制教室© SATOH PHOTO
▽屋顶结构细部© SATOH PHOTO
为了实现将该建筑作为为学习木结构的学...
预览图片