Gymnasium, Renovation, Amsterdam, The Netherlands
  • 设计师:Kevin Veenhuizen Architects
  • 面积:  540 .0m²
  • 年份:2021
  • 摄影:MWA Hart Nibbrig
  • Lead 设计师:Kevin Veenhuizen, Guillaume Pfefferle, Rosa Steenkamp
  • Client:Het Gymlokaal
  • Contractor:Terluin Bouw
  • City:Amsterdam
  • Country:The Netherlands



设计师描述 | Designer description: Het Gymlokaal is a new place in Amsterdam-Noord where people can sport together in a personal and intimate atmosphere. Kevin Veenhuizen Architects transformed two units in this former shipyard, located at the Ij waterfront, into a gym where the industrial characteristics of the building are further accentuated.

The gym is situated in a concrete shipyard built in 1957, named after De Groene Draeck: the sailing ship that Princess Beatrix got as a present for her 18th birthday. In 1995 a steel construction was placed within the concrete grid creating several office units in the building. In 2021 a new chapter was added. To accommodate the new gym two units were merged and the steel construction is completely adapted to the new function.

The spaces are created with mostly reused building elements. All demolished steel and timber beams are reused in the new separating floor constructions, and the interior window frames including the glass are also reused to separate spaces. When for example a window frame would not perfectly fit, plywood fitting parts of a lighter color were made so the reused building part is highlighted as a whole.

A new steel bridge connects the space on the mezzanine floor. The choice of materials and finishes of the bridge are dictated by the reused spiral stairs and railing, forming an industrial look together. Furthermore, the industrial character of the interior is enhanced by stripping the construction literally naked until the concrete, steel, and timber are visible. All pipes of the new installations are carefully positioned so they contribute to the aesthetic quality we aimed to achieve.

On the ground floor, a central double-height hangout is designed. The monolith bar is the heart of the space. The lower strip of green tiles refers to the water level and is a nod to the original function of the building. In the bar a special counter with a sliding window is designed, allowing visitors to check-in from the entrance hall with the bar staff before entering the hangout. From the central hangout, a natural routing guides the visitor to the dressing rooms and sports halls.

For each space, a tailored light plan is designed. In the yoga space, the light is creating a serene atmosphere in contrast to the powerful LED light lines that pump you up in the main sports hall. After noise measurements were performed by an expert, also an acoustic plan was implemented to avoid any noise nuisance.
    • 项目完工照片 | Finished Photos
    vsszan11920020323261.jpg vsszan11920020323262.jpg vsszan11920020323263.jpg vsszan11920020323264.jpg vsszan11920020323265.jpg vsszan11920020323266.jpg vsszan11920020323267.jpg vsszan11920020323268.jpg vsszan11920020323269.jpg vsszan119200203232610.jpg vsszan119200203232611.jpg vsszan119200203232612.jpg vsszan119200203232613.jpg vsszan119200203232614.jpg vsszan119200203232615.jpg vsszan119200203232616.jpg vsszan119200203232617.jpg vsszan119200203232618.jpg vsszan119200203232619.jpg vsszan119200203232620.jpg vsszan119200203232621.jpg vsszan119200203232622.jpg vsszan119200203232623.jpg vsszan119200203232624.jpg vsszan119200203232625.jpg vsszan119200203232626.jpg
      • 转载自:Archdaily
      • 设计师:Kevin Veenhuizen Architects
      • 分类:Renovation
      • 语言:英语
      • 阅读原文

      没搜索到文物库相关内容

      暂无用户创作记录!~

      记录用户以此项目图片为灵感使用Ai进行二次创作。

      暂时没有评论,你回一个呗!~

      您需要登录后才可以回帖 登录 | 注册序赞号

      快速回复 返回顶部 返回列表