...m, or their use as bedrooms for rent.
,At the top, the environment is finally fully observed, it is the final metaphor of the filter of relationships that makes up the journey from the base, it is the point from which the house best expresses its spatial reflection and the relationship with its...
预览图片
...roducts in the factory at WVH and unfolded on the construction site to the final size and then assembled. The elements are very stiff due to the many folds. A independent supporting sub-construction was therefore not necessary. The elements are completely dismountable.
Lively student camp...
预览图片
..., end-users, and overall experience into consideration before landing on a final plan––establishing modularity and flexibility as a key part of the planning process. A neutral architectural palette consisting of light woods, natural stones, and warm accents create an open, airy, and enjoyable at...
预览图片
...ea in the office.,设计师:TLV Design connection,Contractor: Tidhar Finals,摄影:Shai Gil10 Images | expand for additional detail,转载自:Office Snapshots,语言:English,编辑:序赞网,阅读原文
预览图片
... warmth to the spaces and create a more welcoming setting for clients. And finally a continuous strip has been provided around the façade perimeter that takes advantage of the extraordinary views.,The core of the tower with its characteristic concrete structure of reinforced concrete, typical of...
预览图片
...lete all of their ideas in such a manner that show the culture of BIC. The final result incorporates the BIC valuables for “nice and simple”. In total the office is designed for almost 220 people with 2 relax/kitchen areas, reception area, management offices, collaboration areas and meeting room...
预览图片
...念图:
,相关附件下载:
,附件:AMAALA Airport FINAL.pdf,转载自:Archilovers,设计师:Foster + Partners,坐落:Riyadh / Saudi Arabia / 2023,语言:English,阅读原文
预览图片
...ally for the space recalls the movement and rhythm of our beloved city. Finally, the lit structural tracery of the crown is a reinterpretation of the iconic diagonals in the Chrysler Building, now experienced volumetrically from all directions in the city.”,Building on KPF’s City-Shaping Ex...
预览图片
...mitment and trust placed by him have been an essential contribution to the final outcome of the project”. – Vera Lucena, interior designer, Vector Mais.12 张图片 | Pictures设计:Vector Mais 客户:BAI Europa Bank, 面积:11,840 sqft年份:2018坐落:Lisbon, Portugal, 行业:Fina...
预览图片
... mix of neutral, porcelain stone, walnut wood and glass dividers, with the final product energizing a space that now fits a growing international firm. The design blended soft color palettes and semi-neutral tones, which combined with the cutting-edge technology installed in the working spaces, unde...
预览图片
... that made a highly adaptable mix of floorplan typologies possible. In the final project the sizes of apartments range between 65 m2 and 410 m2. Pontsteiger contains 366 apartments, 2000 m² of commercial space, and a parking garage with 338 places.,The main structure is concrete. The bridge’s s...
预览图片
...enue de France, the railway landscape, the entrance to the Ivry suburb and finally the transition from a linear city to a vertical one.
楼层盘旋而上,在各个角度采光,为这层状楼宇增添了魅力,与此同时还给人留下一种渐变的印象。在这个有200个住...
预览图片
...lashings of sumptuous Faena red velvet and cool blue-tiled bathrooms.
The final parts of the plan are similarly curated. The importance of public art is seen in installations from Antwerp-based Studio Job and US artist Jeff Koons, while the cultural programme of the Faena Forum is guided by execut...
预览图片
...e room names for easy co ordination of routine and communal activities and finally the restrooms are not spared either in having a bold and loud tone. The office in totality screams maximalism in its every sense much like the client’s lifestyle.10 张图片 | Pictures设计:MIRA Design Studio ...
预览图片
... buildings: a history museum and a city museum with educational spots, and finally a conference and ceremonial center.
The cultural center creates a new landscape by connecting water, sky and city in a play of iridescent reflections given by this metallic ribbon (made of steel and aluminum) th...
预览图片
...ng the culture in the southwest Hunan Province and industrial feeling, and finally the customer accepted our suggestion.Our consideration is that under the Chinese overall political background in the last century and with the merging of industrial workshops, there was mass smelting steel in the Chin...
预览图片
...hazardous materials and equipment heavy labs are located near the core.The final result is a highly technical space that is collaborative, inspirational and secure, all while allowing scientists to draw inspiration from their environment, connecting them to community, the natural environment, people...
预览图片
...studio. All existing ceilings and floor finishes were removed. Most of the final design incorporates exposed concrete floors and ceilings to increase the perception of height and create a raw aesthetic feel to the space, aligning with the firm’s penchant for simple, clear and minimal design soluti...
预览图片
...levels. In a first for Nike, products can move from sketch to prototype to final design to retail fixture all under one roof.,In its former life, the building site contained a parking lot and an access road to an adjacent building, all next to a beautiful wetland that the campus had turned away fr...
预览图片
... car, so they made multiple trips back and forth from Brooklyn. “When we finally carried the many pieces up the stairs, we put [them] in our living room, feeling especially pleased with ourselves, sat down, and immediately fell in between two of the ‘bread’ cushions that separated under us,”...
预览图片
...tes adaptability for scientific research space to the greatest extent, and finally realizes high-quality construction, the perfect meeting of function and beauty. The achievement of Shenzhen's first application of PC technology This is also the first high-rise educational building to achieve full li...
预览图片
...er to grant maximum flexibility to future alterations to the distribution. Finally, the project seeks to maximise the distribution of the units, and uses the more public spaces in the apartments as distributors, thus avoiding the existence of corridors.,Roof Garden and Collective Areas: The roof h...
预览图片
...en became key to the post-war reconstruction in many countries.
“The final part of the show focuses on contemporary applications including open-source, self-build systems, commercial digital platforms and also maker spaces that work with it. Plywood is more popular now that it has ever been an...
预览图片
...uring the construction
period, difficulties were overcome one by one and finally the architectural ideas were realized completely. ↑ 全景图 Bird view ↑ 总平面图 Master Plan 综合社会效益显著
辛亥革命博物馆于2009年8月动工兴建,2011年9月落成,2011年10月免...
预览图片
...
Although 1228 Madison was envisioned before the COVID-19 pandemic, its final design and layouts conform to the current era’s new style of living. Along with the security and privacy of only one residence per floor, those floors have “lots of windows and cross ventilation,” Whalen says, to ...
预览图片