这个崭新的波兰国家体育场将在2012年作为欧洲足球竞标赛赛场使用。其位于1988年老体育场的位置上。如今这里的景观也焕然一新。体育场建筑可以看成两部分,一是下部的混凝土基座,二是上部的独立式钢斜拉杆织网膜结构。屋顶上的膜是可移动的。球场在四个位置安装了显示屏,保证所有席位的最佳视觉观赏。外表色彩斑斓的丝网钢挂板采用了波兰的传统民族色彩。体育馆立在公园中醒目耀眼,很远都能看见。
Bird‘s view.jpg

Based beside the Vistula.jpg
In 2012, Poland  and Ukraine  will  be  hosting the UEFA European Football
Championship.


For the occasion, a new national stadium will be built in Warsaw on the
existing but crumbling rubble-built Dziesieciolecia Stadium abandoned for
sports  uses in 1988. The stadium  is in Skaryszewski Park east of the city
center on the bank of the Vistula, and will form the heart of a new sports
park. The construction  of the stadium is divided systematically  into two.  
The stand  consists of prefabricated concrete parts. Above this is a steel wire
net roof with a textile membrane hung on freestanding steel supports with
inclined tie rods. The interior  roof consists of a mobile membrane sail that
folds together above the pitch. The video cube with four screens giving optimal  
sightlines  from all seats is also in the middle of the pitch.  The top tier is
accessed via twelve archshaped, single-flight staircases.  The exterior façade  
consists  of anodized  expanded  metal  that provides another transparent
envelope for the actual thermal shell of the interior  areas and access steps.
The stadium  with its exterior façade in the national colors of Poland will
stand out in the park as a landmark visible from afar.



Night view with illuminated membrane.jpg
Project data
Competition 2007, 1st Prize
Design Volkwin Marg and Hubert Nienhoff with Markus Pfisterer
Project leaders Markus Pfisterer, Martin  Hakiel
Co-operation with J.S.K Architekci  Sp. z o.o.
Structural design roof and façade schlaich bergermann und partner, Stuttgart –
Knut Göppert with Knut Stockhusen and Lorenz Haspel
General contractors Konsorcjum Alpine Bau Deutschland AG, Alpine Bau GmbH,
Alpine
Construction Polska Sp. z o.o., Hydrobudowa  Polska S.A. i PBG S.A.
Services engineering HTW, Hetzel, Tor-Westen  + Partners, Biuro Projektów
“DOMAR”
Lighting design Lichtvision  Berlin, Dr. Karsten Ehling, Dr. Thomas Müller
Wayfinding system Wangler  & Abele, Munich
Client Narodowe Centrum Sportu Sp. z o.o.
Roof surface area 69,000 .0m² total, 10,000 .0m² retractable
Seats 55,000
VIP seats 2,600
Construction period 2008–2011
Wiebke



Exterior view with staircase.jpg


Tiers.jpg


View at the playing field.jpg


System section.jpg


Site plan.jpg
Ai 分析中……

暂无用户创作记录!~

记录用户以此项目图片为灵感使用Ai进行二次创作。

暂时没有评论,你回一个呗!~

您需要登录后才可以回帖 登录 | 注册序赞号

快速回复 返回顶部 返回列表