The ceremonial hall in the premises of the town hall in Nový Jičín is the place of the most important life events, whether it is welcoming citizens, concluding marriages or other important meetings. The hall is regularly filled with the happiest emotions. However, its appearance from the end of the 1960s has ceased to be sufficient for the demands placed on the current significant representative space.





Architecture


The new appearance of the hall, vestibule and adjacent facilities is intentionally moderated so that it is above all a dignified background for the events themselves. We have preserved the original layout of the hall - due to its orientation and proportions, the position of the altar in the axis of the longer side is logical, and if not completely ideal, then at least the best possible. We unified the floor in the whole room to one height level by demolishing the podium under the altar, which will undoubtedly contribute to its usability for a more diverse range of opportunities than before. With a few minor layout interventions, we achieved enlargement and illumination of the lobby, in which several offices were originally built. We united all the main spaces with a painting with a decent hand-painted camembert and a precisely executed wooden floor, which replaced the original cool-looking marble tiles. We kept elements with quality and timeless details - especially chandeliers, wall lights and doors. These were carefully refurbished and supplemented with new locksmith and carpentry products. New circular handles were added to the original door, new brass grilles were inserted under the window sills, and the altar is also new. The motif of interconnected circles, characteristic of the events that will take place here, is intertwined with all the new elements.





Team


Alice Svobodová and Martin Jan Rosa worked out a proposal for the reconstruction of the ceremonial hall in mid-2017. Together with them, two more architectural studios were invited to submit proposals, and after two rounds of evaluation, our solution was selected as the most successful. The reconstruction was carried out in the period from autumn 2018 to spring 2019.





Project Details


Authors of design and project: Ing. arch. Martin Rosa, Ing. arch. Alice Svobodová


Partial profession of the project: Ing. Aleš Palička (statics), Martina Pantůčková (ZTi), Roman Michoněk (VZT), Ing. Lukáš Hejný, Ph.D. (PBŘ), Marek Macík (budget)


Realization: VYKI TOOLS GROUP, s.r.o., Ing. Tomáš Vytlačil


Subcontractors: Michal Bolehovský (wooden floors), carpentry Milan Šindler (joinery products), TON a.s. (furniture), Jiří Marhold (locksmith products) and others.


Technical supervision of the investor: Ing. Karel Trlica





I thank Mgr. Ondřej Syrovátek, Deputy Mayor of the city, and Mgr. Zdeněk Petroš and Ing. Michaela Mrklovská from the town hall.


                       
    • 项目完工照片:
    vsszan5776191629071.jpg vsszan5776191629072.jpg vsszan5776191629073.jpg vsszan5776191629074.jpg vsszan5776191629075.jpg vsszan5776191629076.jpg vsszan5776191629077.jpg vsszan5776191629078.jpg vsszan5776191629079.jpg vsszan57761916290710.jpg vsszan57761916290711.jpg vsszan57761916290712.jpg vsszan57761916290713.jpg vsszan57761916290714.jpg vsszan57761916290715.jpg vsszan57761916290716.jpg vsszan57761916290717.jpg vsszan57761916290718.jpg

                           
      • 平面与结构图:待补充……

                             
        • 效果与概念图:待补充……

                               
          • 转载自:Archilovers
          • 设计师:Martin Rosa
          • 坐落:Nový Jičín / Czech Rep. / 2019
          • 语言:English
          • 阅读原文

          没搜索到文物库相关内容

          暂无用户创作记录!~

          记录用户以此项目图片为灵感使用Ai进行二次创作。

          暂时没有评论,你回一个呗!~

          您需要登录后才可以回帖 登录 | 注册序赞号

          快速回复 返回顶部 返回列表