中国北京BIT体育中心(2019)Atelier Alter Architects设计

BIT Sports Center in Beijing





Located in Liangxiang, the satellite city of Beijing, the BIT Sports Center, along with the BIT Stadium, frame an entrance to the new BIT campus. The sports center adds about 15,692 square meters athletic space to the school, includes a 3000 seats basketball stadium, a 10 lanes swimming pool, a gymnasium, a martial art space, and rooms for boxing, taekwondo, table tennis, etc.





BIT is a university focused on military science. The project continues Leonardo Da Vinci’s dialogue on the interdisciplinary discourse between science, architecture and art. After researching on related art and history of material science, the project draws inspiration from Da Vinci’s flying machine, as well as the geometry of trajectory parabola widely used in military science. Accordingly, two sets of parametric surfaces are created to suspend in the air as the roof for the building. The topological volume framed by the two curve layers are constructed through space frame structurally and covered by standing seam roofing from above and aluminum curtain wall system from below. Aluminum are used over roof, cantilever and facade to give a uniform tone to the building and to response to the industrial aesthetic in military science.





As the Renaissance man in Da Vinci’s time understood intellects as polymaths excelled both in body and mind, the BIT sports center aims for a “multidimensional open campus” that builds students’ body and mind simultaneously and meanwhile, encourages intercollegiate dialogues among students. By doing that, the architecture creates spatial permeability in both urban and architecture scales, through plan and section. The basketball hall, located at the south east corner of the building, merges the play field with major artery and street life, while the swimming pool at the west is linked to campus central square. Besides urban scale connections, as the seating for basketball hall is elevated for one floor, the programs beneath it are all interconnected and also well connected to the exterior. A horizontal physical and visual permeability, from street to campus, is established at the ground floor. An enclosed entrance promenade, cut between swimming pool and basketball hall, connected north and south campuses together. In the section, the top of basketball seating at the third floor has a large window overlooking the entrance hall and the swimming pool across the hall, as well as the campus beyond the swimming pool. At second, third and fourth floors, the programs behind the swimming pool—taekwondo, table tennis and testing center—all have different apertures into the swimming pool and also share the skylight from the swimming. With transparent interface, vertical permeability is achieved by nesting programs within one and another in section.      








Client: Beijing Institute of Technology


Location: Beijing, China


Category: Sports Center


Architecture and Interior Design: Atelier Alter Architects PLLC


Architect of Record: China IPPR International Engineering Co., Ltd.


Design Consultant: Beijing Hanhua Architectural Design Co.Ltd


Design Principal: Yingfan Zhang, Xiaojun Bu


Architecture Design Team: Zhenwei Li, Kai Qin, Ping Jiang, Wei Huang, Tongwei Liu, Dehu Du, Jiahe Zhang, Ran Yan, Lairong Zheng, Jiaming Mei, Lidong Song, Xiaoxiao Zhao, Jingshi Zhang, Bida Wei, Wei Xiong, Weidi Chen, Xiaoqing Guo, Xueyun Da, Bo Huang, Leilei Ma, Hui Cao


Structure: China IPPR International Engineering Co., Ltd.


MEP: China IPPR International Engineering Co., Ltd.


Interior Design: Atelier Alter Architects


Landscape Architect: China IPPR International Engineering Co., Ltd.


Curtain Wall Consultant: PAG Façade Systems Co., Limited


Lighting Consultant: Jingyunyoujin Lighting Technology (Beijing) Co., Ltd,Zhongchen Yuanzhan (Beijing) Lighting Design Co., Ltd,


Acoustic Consultant: China IPPR International Engineering Co., Ltd.


Construction Management: Beijing Zhongjing Hengji Engineering Management Co., Ltd


General Contractor: Beijing Construction Engineering Group CO. Ltd (BCEG)


Interior Contractor: Beijing Senghongli Engineering Co., Ltd.


Curtain Wall Contractor: Shandong Sky Screen Group Corporation


Manufacturers: Hoofovens Architecture System (Guangzhou) Co., Ltd., Taitong Construction Co., Ltd ., Beijing Borongsheng Industry and Trade Co., Ltd.


Cost: $23,449,011


Area: 168,907.3 SF 15692 sqm


Project Completion: 07.2019


Photography: Weiqi Jin, Highlite Images, Atelier Alter Architects


Images: Courtesy of Atelier Alter Architects


                       
    • 项目完工照片:
    vsszan6237290038231.jpg
    vsszan6237290038232.jpg
    vsszan6237290038233.jpg
    vsszan6237290038234.jpg
    vsszan6237290038235.jpg
    vsszan6237290038236.jpg
    vsszan6237290038237.jpg
    vsszan6237290038238.jpg
    vsszan6237290038239.jpg
    vsszan62372900382310.jpg
    vsszan62372900382311.jpg
    vsszan62372900382312.jpg
    vsszan62372900382313.jpg
    vsszan62372900382314.jpg
    vsszan62372900382315.jpg
    vsszan62372900382316.jpg
    vsszan62372900382317.jpg
    vsszan62372900382318.jpg
    vsszan62372900382319.jpg
    vsszan62372900382320.jpg
    vsszan62372900382321.jpg
    vsszan62372900382322.jpg
    vsszan62372900382323.jpg
    vsszan62372900382324.jpg
    vsszan62372900382325.jpg
    vsszan62372900382326.jpg
    vsszan62372900382327.jpg
    vsszan62372900382328.jpg
    vsszan62372900382329.jpg
    vsszan62372900382330.jpg
    vsszan62372900382331.jpg
    vsszan62372900382332.jpg
    vsszan62372900382333.jpg
    vsszan62372900382334.jpg
    vsszan62372900382335.jpg
    vsszan62372900382336.jpg
    vsszan62372900382337.jpg
    vsszan62372900382338.jpg
    vsszan62372900382339.jpg
    vsszan62372900382340.jpg
    vsszan62372900382341.jpg
    vsszan62372900382342.jpg
    vsszan62372900382343.jpg
    vsszan62372900382344.jpg
    vsszan62372900382345.jpg
    vsszan62372900382346.jpg
    vsszan62372900382347.jpg
    vsszan62372900382348.jpg
    vsszan62372900382349.jpg
    vsszan62372900382350.jpg
    vsszan62372900382351.jpg
    vsszan62372900382352.jpg
    vsszan62372900382353.jpg
    vsszan62372900382354.jpg
    vsszan62372900382355.jpg
    vsszan62372900382356.jpg
    vsszan62372900382357.jpg
    vsszan62372900382358.jpg
    vsszan62372900382359.jpg
    vsszan62372900382360.jpg
    vsszan62372900382361.jpg
    vsszan62372900382362.jpg
    vsszan62372900382363.jpg
    vsszan62372900382364.jpg
    vsszan62372900382365.jpg
    vsszan62372900382366.jpg
    vsszan62372900382367.jpg
    vsszan62372900382368.jpg
    vsszan62372900382369.jpg


                           
      • 平面与结构图:
      vsszan62372900382370.jpg
      vsszan62372900382371.jpg
      vsszan62372900382372.jpg
      vsszan62372900382373.jpg
      vsszan62372900382374.jpg
      vsszan62372900382375.jpg
      vsszan62372900382376.jpg
      vsszan62372900382377.png
      vsszan62372900382378.jpg
      vsszan62372900382379.jpg
      vsszan62372900382380.jpg
      vsszan62372900382381.png
      vsszan62372900382382.png
      vsszan62372900382383.jpg
      vsszan62372900382384.png
      vsszan62372900382385.jpg
      vsszan62372900382386.png
      vsszan62372900382387.png
      vsszan62372900382388.jpg
      vsszan62372900382389.jpg
      vsszan62372900382390.jpg
      vsszan62372900382391.png


                             
        • 效果与概念图:待补充……

                               
          • 转载自:Archilovers
          • 设计师:Atelier Alter Architects
          • 坐落:Beijing / China / 2019
          • 语言:English
          • 阅读原文
          AI文本分析中……
          AI色彩命名中……

          序赞Ai时刻等待着你的命令!~

          与Ai对话形式持续执行相关Ai智能体任务。

          暂时没有评论,你回一个呗!~

          您需要登录后才可以回帖 登录 | 注册序赞号

          快速回复 返回顶部 返回列表