Schools, Renovation, Torino, Italy
  • 设计师:BDR bureau
  • 面积:  5069 .0m²
  • 年份:2019
  • 摄影:Simone Bossi
  • 建造商: Infiniti, Pedrali, VS America
  • Structural And Executive Planning:Sintecna srl
  • Mechanics And Electrical Advisor: Proeco ss
  • Sustainability And Acoustics Advisor:Onleco srl
  • Construction Supervision:Sintecna srl
  • Art Direction:BDR bureau
  • Project Manager:FCA Partecipazioni S.p.A
  • City:Torino
  • Country:Italy
  • 设计师描述 | Designer description: The existing school building, built in the 1960s in the Nizza Millefonti district between the former industrial area of the Lingotto and the Po river in the south-east area of Turin, has been extended and it is functionally rethought. The new educational needs – in which the school becomes an integral part of the community and merges with the urban fabric – represents the future of education and architecture for the Italian school.
  • The Fermi School, a middle school, opens up to the urban sphere through the reorganization of its entrances and of its external spaces. The back of the existing building becomes the large new main entrance, shaping a green space while unfolding to the neighborhood and emphasizing the concept of a community school. The ground floor is an extension of the public space: integrating a series of services open to everyone, such as the gym, the library, the auditorium, and the cafeteria.
  • BDR bureau mainly operates by addition: a new steel structure creates an inhabited envelope where the terraces are an integral part of the teaching program, embraces new connective spaces and works as a passive shield. The modularity of the new frame outlines a thread-like backbone, completed by a metal net that highlights the visual permeability and the relationship with the outside. The frame’s compositional scheme is also repeated in the old building, whose façades are treated with a multigrain plaster creating depth variations.
  • The façades of the new front and those facing towards the courtyards maintain large windows that enhance the relationship between the various different volumes and the outdoor spaces, bringing new meaning to the original layout. The ground floor is designed as a civic center, where the different functions are gathered in the atrium, directly connected with the garden and the two entrances. The atrium stretches to the upper floors thanks to a vertical element, a stairwell that evokes the external architectural language. The flexible library and auditorium space, the cafeteria and the gym complete the public spaces on the ground floor.
  • On the two upper floors, the atrium accommodates recreational and collective spaces, while the educational activities are organized in clusters – spatial units composed of classrooms, cloakrooms, services and informal learning spaces. The classrooms become the meeting point and the linkage between inside and outside, retaining a visual connection to the common space and giving access to the terraces. Just like inthe experimental en plein air schools, educational and recreational activities take place outdoors. In these open spaces, the green areas and the dialog with the surrounding landscape encourage students and professors to meet and exchange ideas in their daily activities, thus adding great value.
  • The planning project shared with the community carries an explicit and higher ambition as well: “to set the standard by building a school in both the pedagogical and educational sense”. At the same time, the innovation of the school structure and the inclusion of new architectural and spatial elements make the Fermi School by BDR bureau a case study, a replicable model for the requalification of the school building heritage.
    • 项目完工照片 | Finished Photos
    vsszan9873151939551.jpg vsszan9873151939552.jpg vsszan9873151939553.jpg vsszan9873151939554.jpg vsszan9873151939555.jpg vsszan9873151939556.jpg vsszan9873151939557.jpg vsszan9873151939558.jpg vsszan9873151939559.jpg vsszan98731519395510.jpg vsszan98731519395511.jpg vsszan98731519395512.jpg vsszan98731519395513.jpg vsszan98731519395514.jpg vsszan98731519395515.jpg vsszan98731519395516.jpg vsszan98731519395517.jpg vsszan98731519395518.jpg vsszan98731519395519.jpg vsszan98731519395520.jpg vsszan98731519395521.jpg vsszan98731519395522.jpg vsszan98731519395523.jpg vsszan98731519395524.jpg vsszan98731519395525.jpg vsszan98731519395526.jpg vsszan98731519395527.jpg vsszan98731519395528.jpg vsszan98731519395529.jpg vsszan98731519395530.jpg vsszan98731519395531.jpg vsszan98731519395532.jpg vsszan98731519395533.jpg vsszan98731519395534.jpg vsszan98731519395535.jpg vsszan98731519395536.jpg vsszan98731519395537.jpg vsszan98731519395538.jpg vsszan98731519395539.jpg vsszan98731519395540.jpg vsszan98731519395541.jpg vsszan98731519395542.jpg vsszan98731519395543.jpg vsszan98731519395544.jpg vsszan98731519395545.jpg vsszan98731519395546.jpg
      • 转载自:Archdaily
      • 设计师:BDR bureau
      • 分类:Renovation
      • 语言:英语